Retrofit Quick-Check · Conversion and modernisation

Technical pre-assessment for plant conversions and modernisation

Conversions in existing plants are rarely as simple as they look. We calculate the existing line, place the new machine in the 3D model and assess integration, CE and permitting risks before you place the order.

Operators · Plant and maintenance managers · Plant builders and integrators

Why conversions in existing plants cost more than planned

The risks rarely lie in the new machine itself. They lie in its effect on the line it is built into.

📈

The bottleneck moves on

A more powerful machine shifts the bottleneck to the next point: conveyor, bunker, screen or quality control. Without a mass balance of the whole line, this only shows up after commissioning.

📐

The plant differs from its drawings

Plants that have grown over years rarely match their drawings. Steelwork, platforms, walkways and load reserves have to be surveyed on site before the new machine is ordered.

🛡️

The conversion affects CE and the permit

A new machine can affect the safety functions and the CE conformity of the assembly of machinery. If the plant leaves its permitted scope, the conversion itself can require a permit.

Assessing a plant before an acquisition? That is what our Technical Due Diligence is for.

Six assessment areas in four steps

Layout, process, integration, CE, permitting and operation. Each area receives a traffic-light rating, each rating a justification.

A

Survey and mass balance

The starting point is the line as it runs today.

  • Review of as-built drawings, permits and technical documentation
  • Site visit and survey of the interfaces
  • Mass balance of the existing line in t/h and m³/h
  • Where no sorting analysis exists, back-calculation from the measured output fractions
  • Load and bottlenecks shown per machine and per conveyor
B

Process and material flow

What the new machine delivers and what it demands from the line.

  • Throughput, separation task and operating point of the new machine
  • Effect on upstream and downstream stages in the mass balance
  • Conveyors, bunkers and buffers checked against the new volume flow
  • Integration options with advantages and disadvantages
  • Rough estimate of investment and downtime per option
C

Layout and integration in the 3D model

Whether the new machine fits, can be brought in and can be maintained.

  • 3D fit check with the parametric library in Autodesk Inventor
  • Space requirement, accessibility and maintenance access
  • Installation route and assembly sequence, also during operation
  • Steelwork and platforms: need for modification and structural verification
  • Interfaces to electrics, controls and dust extraction
D

CE, permitting and operation

What the conversion triggers legally and in operation.

  • Effect on safety functions and the CE conformity of the assembly of machinery
  • Check whether the conversion takes the plant outside its permitted scope: in Austria under § 37 AWG 2002 or the GewO 1994, in Germany for installations requiring a permit under §§ 15, 16 BImSchG, elsewhere under the applicable national regulations
  • Downtime and operating logic during the conversion
  • Service and maintenance access after the conversion
  • Traffic-light rating per area with a recommendation

What you receive

A short report that lets you decide on the conversion before machines are ordered.

  • Mass balance of the existing line
  • Bottleneck analysis per machine
  • 3D fit check and general arrangement
  • Traffic-light rating in six areas
  • List of CE and permitting issues
  • Recommendation with next steps
Rating: green means plausible, amber means a detailed review is recommended, red means high integration or regulatory risks. The Quick-Check is a technical pre-assessment. Reliable statements on CE conformity, installation effort, CAPEX or structural capacity require detailed design and a site survey.

Why Experts4Recycling

💻

Engineering in-house

Mass balance and 3D model are produced by the same team. The assessment rests on calculated volume flows and a verified fit.

🔄

Both sides of the contract

More than 20 years in sorting and recycling plant engineering, on the supplier side and on the operator side. We know what a machine delivers and what is missing from a quotation.

📋

CE and permitting in the same view

Permitting law and CE conformity are assessed together with the technology. That leaves no gaps between the disciplines.

20+ yearsPlant engineering, supplier and operator side
70+ countriesProject experience on 4 continents
4 languagesEN · DE · FR · ES at negotiation level
6 areasLayout, process, integration, CE, permitting, operation

Conversions and optimisations, a selection

  • Austria: Conversion of a PET sorting plant with replacement of the NIR sorters, through to acceptance.
  • Austria: Concept for chlorine removal in an existing refuse-derived fuel processing line, based on the acceptance data of the existing line.
  • Austria: Optimisation of the sorting ahead of a plastics washing plant: 3D model of the existing plant and options for buffer and conveyor technology.

We correspond in English or German.

Request a Retrofit Quick-Check

Describe the line and the planned conversion briefly. We reply within 24 hours.

Please enter your first name.
Please enter a valid email address.
Please select your role.
Please select the stage of the conversion.
Please describe the conversion briefly.

Your data is treated confidentially and not passed on to third parties. We use it only to answer your request.

✅

Request received

Dipl.-Ing. Thomas Baldt will contact you personally within 24 hours.

For urgent matters you can reach us directly at
+43 664 73030310 – by phone or via WhatsApp – or at office@experts4recycling.com